TPS x 10 / XX: if 10 then 100% TPS is 100% Load,
if 25 then 100% TPS is 33% Load that gives 33% of max hard shift.
If boost part is set to 1 than boost does not make the shift harder.
If boost part is set to 33 than boost at 1 BAR makes Load = TPS part + 33%.
Temperature Correction
General Firmness
Shift Speed Configuration
General Parameters
Kickdown Speed
TPS Compensation
Shift Speed Overview Chart
■ Min upshift speed■ Max upshift speed■ Min downshift speed■ Max downshift speed
Min upshift speed
Max upshift speed
Min downshift speed
Max downshift speed
Visual Boost Curve
Boost Configuration
AUX Configuration
Select AUX Output
Sensor Configuration
TPS Sensor
Volt & Temp reg
Boost Sensor
EGP Sensor
Speed Sensor
RPM Sensor
Lockup
Lockup Configuration (Address: 272) - Value: 0
CANBUS Control
System & Protocol Profile (Address: 484) - Value: 0
Gear Lever
3-4 Shift
If set to 0 then 3-4 shift is normal if set to -1 it will only shift if TPS is lower then 10% if set to -2 TPS has to be lower than 20% if -9 lower then 90%
Factory setting
Paddle input
Timing
Not used
Real-time TCU Telemetry
(Not streaming)Log lines: 0
SPEEDOMETER
0KM/H
MOTOR RPM
0RPM
ACTUAL GEAR
-
ACTIVE GEAR
GEAR LEVER
P
SELECTOR
SHIFT MODE
A
AUTO / MAN
TPS (THROTTLE)
0 %
0%50%100%
BOOST PRESSURE
0.00 BAR
0.0 BAR1.5 BAR3.0 BAR
LOAD (GEAR LOAD)
0 %
0%50%100%
EGP (EXHAUST GAS PRESS)
0.00 BAR
0.0 BAR1.5 BAR3.0 BAR
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
LIVE TELEMETRY HISTORY 1
LIVE TELEMETRY HISTORY 2
Shift Analyse
(Not streaming)
Shift Recorder: the Arduino itself records every new Gear 1 / Gear 2 RPM value with its exact time, for 300 mS from the shift start (OkGoShift 1 → 0), and sends the result after the shift, so the serial port is never the limit. Resolution is one value every 4 mS or better at high RPM, every 10 mS at 1000 RPM. Needs the sketch with the shift recorder.
The steepest rise and fall of each curve tells how hard the shift was. TPS, Load and the Shift Firmness points used are stored with the shift.